Getting back into the projects
It is now time to get cracking on the projects have have been on hold since the arrival of Zachary.
This weekend I got back to work on the basement bathroom. We got some paint on the walls, re-attached the lighting and test fit the vanity and sink.
There is still quite a few things left for the basement bathroom.
- tile shower floor
- tile bathroom floor
- grout tile
- install baseboards
- install crown molding
- install sink fixtures
- install toilet
- install door
- install wall fixtures
Once I put them all in a list, it doesn't seem like that much!


0 Comments:
Post a Comment
<< Home